Polymer modified asphalt waterproof coating
- Package : Barreled
- Weight : 20kg/25kg
- Colour : customizable
- Shape : Water
- Dosage : About 2kg/㎡ (different thickness, different dosage)
This product uses petroleum asphalt as base material, high-quality rubber as modifier, natural nanomaterials as filler, and a water-based environmentally friendly waterproof coating produced by a scientific formula of polymer polymer. The product is non-toxic, odorless, and environmentally free. It can be cold applied to the wet base layer. The rubber polymer is distributed in a network in the coating system. The coating film has excellent acid resistance, alkali resistance and weather resistance after drying. A seamless integral waterproof layer can be formed on the waterproof base layer, and the construction is simple and quick.
1. Due to the high polymer under the action of temperature and machinery, the asphalt enters its three-dimensional network structure and becomes an organic polymer elastomer, which greatly improves the performance of the asphalt and gives the product the characteristics of rubber.
2. Convenient construction, wide application range, and obvious advantages for construction of complex parts.
3. Convenient maintenance, only need to repair the damaged parts locally, and still achieve the original waterproof effect.
4. After curing, a non-connected, complete elastic waterproof layer is formed, which improves the waterproof and impermeability of construction projects, which cannot be achieved by coil products.
1. The base layer is required to be firm, flat, free from debris, and fully dry. The female and male corners should be arc-shaped, the diameter of the female corner is greater than 50mm, and the diameter of the male corner is greater than 10mm.
2. Ingredients and dosage: According to the construction dosage, mix the components A and B according to the proportion, stir and use evenly. The reference dosage is about 1.3-1.5kg/m2 for 1mm thick coating film.
3. Large-area waterproof construction: evenly coat or spray the mixed paint with a rubber or plastic scraper. The thickness is required to be the same, generally 1.5mm-2.0mm. It should be applied in 3-4 times or after spraying. After the previous painting and curing to form a film, the painting or spraying is carried out in a vertical direction, usually a separate film formation, and a layer of carcass reinforcement material should be added to the underground engineering floor.
4. Coating film thickness: 1.5mm-2.0mm for subway engineering, 1.2mm-2.0mm for underground engineering, generally 1.5mm, bathroom and bath room should not be less than 1.5mm, when exposed roof engineering adopts multi-channel waterproofing, each channel The thickness is not less than 1.2mm. When the waterproof level is 111 for one roof, the waterproof thickness is not less than 2mm. When the carcass reinforcement is added between the coatings, the thickness of the coating under the carcass is not less than 1.0mm, and the coating on the top is not less than 0.5mm
5. Protective layer: The surface of the coating waterproof layer should be isolated and protected according to the design requirements.
Contact
Add:Taitou Town Industrial Park, Shouguang City, Shandong Province
Mail:rongjing@rongjingwaterproof.com
Facebook:+86-18653628345
Whatsapp:+86-18653628345
Wechat:+86-18653628345
Scan code
Copyright by@2020 Weifang Rongjing Waterproof Engineering Co., Ltd. 鲁ICP备14020741号-1 Power by:www.300.cn